How Much Gravel for a Driveway: A Three-Layer Example in Tons
A 12 x 50 ft driveway built in three compacted layers takes about 20 cubic yards, or 28 tons. Here is the calculation layer by layer, with densities, the compaction range and what the numbers leave out.
