How much concrete for a 10x10 slab?

A 10 ft x 10 ft slab 4 in thick is 33.3 cu ft, or 1.23 cubic yards. With 10 % for spillage and an uneven subgrade it is 1.36 cubic yards, which is 62 bags of 80 lb concrete mix or 82 bags of 60 lb.

The slab
ft
in
ft
in
Covers spillage and a subgrade that is never perfectly flat.

Concrete for your slab

1.36cubic yards

10 x 10 ft at 4 in is 1.36 cu yd with waste, or 62 bags of 80 lb. Past a yard, price a ready-mix truck against the bags.

Bags of 80 lb
620.6 cu ft per bag
Bags of 60 lb
820.45 cu ft per bag
Bags of 50 lb
980.375 cu ft per bag
Bags of 40 lb
1230.3 cu ft per bag
Ready-mix order
1.5 cu ydrounded up to the next quarter yard

The numbers above are a worked example for a 10 ft x 10 ft slab 4 in thick with a 10 % waste allowance. Allow this page to run scripts in your browser to use your own dimensions, or follow the formula further down the page and do it by hand.

Before the pour

A slab is only as good as what it sits on, and the forms set its thickness.

Outbound links to suppliers may earn us a commission at no extra cost to you. We do not collect your name, email, phone number or address, and there is no form on this site.

How the concrete slab calculator works, step by step

A slab is a box: length times width times thickness. The only traps are the units, because the thickness is measured in inches and the order is placed in cubic yards, and the rounding, because bags come whole. For footings, round columns, post holes and steps, the general concrete calculator handles each shape.

Step 1 - volume volume (cu ft) = length (ft) x width (ft) x thickness (in) / 12
Step 2 - waste volume to order = volume x (1 + waste / 100)
Step 3 - cubic yards cubic yards = volume to order / 27
Step 4 - bags bags = volume to order / bag yield, rounded up
yields: 80 lb = 0.6 cu ft, 60 lb = 0.45, 50 lb = 0.375, 40 lb = 0.3

Worked example: a 10 ft x 10 ft slab, 4 in thick

  • Volume: 10 x 10 x 4 / 12 = 33.33 cu ft
  • With 10 % waste: 33.33 x 1.1 = 36.67 cu ft
  • Cubic yards: 36.67 / 27 = 1.36 cu yd
  • 80 lb bags: 36.67 / 0.6 = 61.1, so 62 bags
  • 60 lb bags: 36.67 / 0.45 = 81.5, so 82 bags

Concrete for common slab sizes

Every slab below is 4 in thick with a 10 % allowance. The ready-mix column is rounded up to the next quarter yard; ask your plant how it sells small loads, since many add a fee under a minimum order.

Slabs 4 in thick, with 10 % waste
SlabCubic yards, netWith waste80 lb bags60 lb bagsReady-mix
10 x 10 ft pad1.231.3662821.5 cu yd
12 x 12 ft patio1.781.96881182 cu yd
10 x 20 ft2.472.721231632.75 cu yd
12 x 24 ft driveway3.563.911762354 cu yd
20 x 20 ft4.945.432453265.5 cu yd
24 x 24 ft garage7.117.823524708 cu yd

Thickness changes the order in proportion. The same 10 x 10 ft slab takes 1.70 cu yd, or 77 bags of 80 lb, at 5 in, and 2.04 cu yd, or 92 bags, at 6 in. The full table of bags per cubic yard for each bag size is on concrete bags per yard.

How thick should a concrete slab be?

Four inches is the usual thickness for patios, walkways, shed pads and a driveway that only sees passenger cars. Five to six inches is common for driveways that carry pickups, RVs or delivery trucks, and for slabs under heavy equipment. Garage floors are usually 4 in, thickened at the edges. These are common practice, not a code: your local building department, or the plans for the structure, set the thickness where it is regulated.

Whatever the design thickness, the forms decide what you actually pour. A form set 1/2 in high over a 20 x 20 ft slab adds about 0.6 cu yd, which is one reason the waste allowance is there.

The base under the slab

Most slabs on grade sit on 4 in of compacted gravel or crushed stone. The base gives an even, draining surface to pour on, and it keeps the slab thickness uniform. Its volume is the slab area times the base depth, plus an allowance for compaction; the gravel calculator turns it into cubic yards and tons. For a gravel driveway with no concrete at all, the gravel driveway calculator works out all three layers.

Bags or ready-mix?

An 80 lb bag yields 0.6 cu ft, so a cubic yard is 45 bags and 1.8 tons of dry mix to lift, mix and place. Up to about a yard, bags and a rented mixer are manageable for two people. Past that, a ready-mix truck is usually faster and often cheaper, and a single truckload pours the slab in one go without cold joints. If the truck cannot reach the forms, add a concrete pump or a line of wheelbarrows to the plan.

Cases the simple formula does not cover

Thickened edges

A garage slab or a slab that carries a wall is often thickened along its edges, typically to 8 or 12 in over a width of 8 to 12 in. Work out the thickened strip as a footing in the concrete calculator, using only the extra depth below the slab, and add it to this result.

Odd shapes

Split an L-shaped or stepped slab into rectangles, run each one, and add the cubic yards. Round the bag count once, at the end, rather than per rectangle.

Slopes

A slab with a fall for drainage is thicker at one end. Average the thickness at the high and low ends and enter that figure.

Frequently asked questions

How many bags of concrete for a 10x10 slab?

At 4 in thick with 10 % waste, 62 bags of 80 lb or 82 bags of 60 lb. At 6 in thick, 92 bags of 80 lb. Without the waste allowance, the 4 in slab is 56 bags of 80 lb exactly, which leaves nothing for a low spot.

How many yards of concrete for a 24x24 garage slab?

At 4 in thick, 7.11 cubic yards, or 7.82 with 10 % waste, so an 8 cubic yard order. Thickened edges come on top of that and are worked out separately.

How thick should a concrete driveway be?

Four inches is common for passenger cars, and five to six inches for pickups, RVs and delivery trucks. A 12 x 24 ft driveway 4 in thick takes 3.91 cubic yards with 10 % waste, and about 4.9 at 5 in.

Should I use bags or order ready-mix for a slab?

Bags are practical up to about one cubic yard, which is 45 bags of 80 lb. Past that, a ready-mix truck is usually faster, avoids cold joints between batches and is often cheaper once you count the mixer rental and the labor.

Source

Bag yields per QUIKRETE, Concrete Mix No. 1101 data sheet (bag yields). The volume arithmetic is the definition of a cubic foot and a cubic yard. Other brands publish their own yields, usually within a few percent of these figures; the bag you buy wins.